top of page

Fort Valley State University:

  • Control Replacement for Stallworth, Peabody Trades, Hunt Library, Tabor Building (2014) ($760,000.00):

    • Project developed equipment lists, points list, revised sequences of operation and drawings for the buildings and systems.  Work included limited commissioning.

  • Boiler Replacement Founders Hall (2014): Replaced boiler in historic campus building.

  • Boiler Replacement Peabody Trades (2015): Replaced boiler and pumps in another historic campus building. 

  • Carnegie Building Renovation (2015)

  • Boiler Replacement for Meyers Hall.

  • Home Management Building Renovation (2014)

bottom of page