top of page
Engineering Solutions For The New Age
Sacred Heart Catholic Church:
-
(2015) 49,000 S.F.; Total Cost: $9,000,000; Designed: 2015; Delivery Method: Construction Manager. . Total Engineers used innovative technology to reduce the outside air load for the building and reduce the cost of the HVAC system to $12/S.F. (2015 pricing).
bottom of page